Capacity Engineering designed a new aluminum bulkhead (movable diving platform) for the Olympic swimming pool at the University of Ottawa. Due to the corrosive nature of chlorinated water, the bulkhead was required to be designed with aluminum instead of steel. The project was completed in Winter 2023.